Margali's Griffin Wood Ranch

Kids had fun with their cousins and the pond. Had to go bring them a 5gal bucket of rinse water.

123_1(1).jpeg
 
Small delays with the work. We need to dig 2 holes 24" deep to concrete in the meter base. We got one of the 43cc 8" post hole augers. It got to 12" fairly easy but that was it. Got another couple inches with effort and then it died. About 15" down is the solid clay. Going to have to rent a big walk behind unit. There goes $250 for 2 holes $%!$$!.

And the combination of vibration and heat outdoors triggered another one of husbands weird migranes. Atleast this one wasn't bad and he felt better after about 3 hours.
 
Back
Top